04 92 97 82 53 info@celticgolf.net
Select Page

The re-construction of the putting green at Terre Blanche was undertaken in February 2008. With time being a crucial factor, the green was turfed following construction.  The green was constructed to USGA specification with the irrigation re-designed and installed. This project took three weeks to complete and the green was in play within three months.