by celticstafflogin | Mar 8, 2016 | golf course construction
The re-construction of the putting green at Terre Blanche was undertaken in February 2008. With time being a crucial factor, the green was turfed following construction. The green was constructed to USGA specification with the irrigation re-designed and installed....